Register
MN10-086
Title: City of Dawson
Wastewater Treatment Facility - Municipal Undertaking
1. APPLICATION
- 1.1 Schedule 4 and Letter, 10.12.21
- 1.2 Information Sheet
- 1.2.1 Agent Authorization
- 1.2.2 City of Dawson Type A Water Licence Application
- 1.3 Maps and Figures
- 1.3.1 Project Location
- 1.3.2 Site Map
- 1.3.3 Quigley Landfill Site Plan
- 1.3.4 First Nation Settlement Lands
- 1.3.5 Process Flow Diagram
- 1.3.6 Concrete Foundation Plan
- 1.3.7 Upper Floor Plumbing
- 1.3.8 Typical Section Through Building
- 1.3.9 Water Systems
- 1.4 Technical Memo Re: Reactor Shaft not requiring a type B licence
- 1.4.1 Water Use & monitoring During Construction
- 1.5 Geotechnical Evaluation
- 1.6 Technical Memo RE: Hydraulic Test Results
- 1.7 Corix Technical Proposal and Mandatory Elements
- 1.7.1 Appendix A - Corporate Information
- 1.7.2 Appendix B - Supplementary Resumes for Key Personnel
- 1.7.3 Appendix C - Conceptual Design Drawings
- 1.7.4 Appendix D - Process Design Calculations
- 1.7.5 Appendix E - Equipment
- 1.7.6 Appendix F - Annual Operating Cost
- 1.7.7 Appendix G - Electrical Costs Sensitivity Analysis
- 1.7.8 Appendix H - Corix Manuals
- 1.7.9 Appendix I - Noram Appendices to the Technical
- 1.8 Endorsements, Awards & Letters of Recommendation
- 1.8.1 Vertreat and Vertad
- 1.8.2 Japan
- 1.8.3 China
- 1.8.4 USA
- 1.9 Aeration Shaft Subsurface Rock Pre-Grounding Procedure
- 1.10 Aeration Shaft Casing Specification
- 1.11 Aeration Casing Annular Grouting Procedure
- 1.12 General Welding Specification
- 1.13 Calculations Process Shaft Stability Analysis
- 1.14 Aeration Shaft Internal Component
- 1.14.1 Mill test Reports
- 1.14.2 NDE Reports (RT & LPI)
- 1.14.3 Welder Qualifications
- 1.15 Aeration Casing Installation Procedure
- 1.16 Figures 9 (Plan View Shaft Grout Hole Locations) and 10 (Profile View Section)
- 1.17 YESAA Project Proposal, Dec. 2009
- 1.17.1 Errata of YESAA Project Proposal 2009-0222
- 1.18 Supplemental Information
- 1.18.1 Noram- Homer Alaska One-Year Performance Report (SUP. 6)
- 1.18.2 Homer VERTREAT Operating Summary (SUP. 6)
- 1.18.3 Noram- Homer Alaska One-Year Performance Report -Scanned Summ.(SUP. 6)
- 1.18.4 Data From Various Deep Shaft Plants (SUP. 7)
- 1.18.5 2002-2003 Virden Nitrification Data (SUP. 7)
- 1.18.6 ABC Mall Plant Certification Data (SUP. 7)
- 1.18.7 Golden Cheese 2006 EPA Compliance Report (SUP. 7)
- 1.18.8 Ryugasaki Deep Shaft Operating Data (SUP. 7)
- 1.18.9 VERTREAT Plant Contacts (SUP. 7)
- 1.18.10 Xingping Operating Data (SUP. 7)
- 1.18.11 Forcemain 14, 1978 Figure (SUP. 8)
- 1.18.12 Forcemain 24, 1978 Figure (SUP. 8)
3. PUBLIC NOTICES
- 3.1 Advertisement, 11.02.11
4. CORRESPONDENCE
- 4.1 Letter to Distribution List Re: Public Hearing, 11.02.07
- 4.2 Letter to participants at the public hearing, 11.03.10
- 4.3 Applicant consent to no public hearing, 11.03.14
- 4.4 E-mail to Environment Yukon asking for clarification, 11.03.16
- 4.5 E-mail to public hearing participants re: cancellation of public hearing, 11.03.18
5. INTERVENTIONS
- 5.1 Steins, J, 11.03.03
- 5.2 Environment Canada - Covering Letter, 11.03.09
- 5.2.1 Environment Canada, Intervention, 11.03.09
- 5.2.2 Attachments
- 5.3 GY - Department of Environment, 11.03.09
- 5.3.1 Supplemental Documentation - Waste Disposal Facility Permit No: 80-003
- 5.3.2 Response to clarification request, 11.03.17
6. RESPONSES TO INTERVENTIONS
- 6.1 City of Dawson Response to Interveners, 11.03.29
- 6.1.1 Appendix A: Recommendations of Quigly Landfill Hydrogeology Report
- 6.1.2 Appendix B: City of Dawson's Solid Waste Facility Permit, No 80-003
- 6.1.3 Appendix C: 2009 Quigly Landfill Hydrogeological Assessment
- 6.1.4 Schedule 1: Dawson Quigly Landfill Monitoring
- 6.1.5 Schedule 2: Grouting Program carried out around shaft locations
- 6.1.6 Schedule 3: Sequence of Work for Process Shaft Installation
- 6.1.7 Schedule 4: Profile Section through East & West Shafts
- 6.1.8 Schedule 5: Holes: East & West Shafts
- 6.1.9 Draft Water License, 11.07.27
7. CURRENT/PREVIOUS WATER USE LICENCE(S)
9. YESAA
10. DECISION
12. OTHER