Register
QZ09-092
Alexco Keno Hill Mining Corp.
Nature of Application: Quartz Undertaking
VOLUME I
1. APPLICATION
- 1.1 Schedule 4 Application, 09.09.03
- 1.2 Quartz Undertaking Information Sheets, 09.09.03
- 1.3A Summary Table of Errata and Clarifications and Summary Table of Additional Information in Response to YWB Requests, 10.05.20
- 1.3B Type A Water Licence Application Report, 09.09.03
- 1.3.1 Water Licence Application, Appendix A: Review of Historic Keno Static Test Data to Define ARD/ML - Controlling and Correlating Factors
- 1.3.2 Water Licence Application, Appendix B: Geoenvironmental Rock Characterization, Bellekeno Zone
- 1.3.3 Water Licence Application, Appendix C: Typical Waste Containment Facility Design, Keno Hill Silver District, YT. Construction Specifications Issued for Use
- 1.3.4 Water Licence Application, Appendix D: N-AML WRDA Geotechnical Evaluation - Potential Mill Sites, Bellekeno Project near Keno City, Yukon
- 1.3.5 Water Licence Application, Appendix E: Material Safety Data Sheets
top
VOLUME II
- 1.3.6 Water Licence Application, Appendix F: Environmental Conditions Report - Version No. 1
- 1.3.6.1 Environmental Conditions Report, Appendix A: Memorandum CCL-UKHM-1, Hydrological Update and Assessment
- 1.3.6.2 Environmental Conditions Report, Appendix B: Preliminary Soils Characteristic Study Report
- 1.3.6.3 Environmental Conditions Report, Appendix C: Soils Characteristic Study Report
- 1.3.6.4 Environmental Conditions Report, Appendix D: 2007 Geochemical Closure Studies Report
- 1.3.6.5 Environmental Conditions Report, Appendix E: Adit Discharge Survey 2007
- 1.3.6.6 Environmental Conditions Report, Appendix F: Digital Water Quality Monitoring Data Summary. Digital Copy Only
- 1.3.6.7 Environmental Conditions Report, Appendix G: Water Quality Assessment Report
- 1.3.6.8 Environmental Conditions Report, Appendix H: 2008 Fisheries Investigation Summary Report
- 1.3.6.9 Environmental Conditions Report, Appendix I: Keno Valley Stream Sediment and Benthic Invertebrate Monitoring Programs, 2007
- 1.3.6.10 Environmental Conditions Report, Appendix J: Aquatic Resource Assessment Report
- 1.3.6.11 Environmental Conditions Report, Appendix K: Elsa Tailings Terrestrial Effects Assessment - Phase I
- 1.3.6.12 Environmental Conditions Report, Appendix L: Elsa Tailings Terrestrial Effects Assessment - Phase I
VOLUME III
- 1.3 Type A Water Licence Application Report Continued
- 1.3.7 Water Licence Application, Appendix G: Conceptual Mill and Tailings Location - Fame and Moth Pit
- 1.3.8 Water Licence Application, Appendix H: Annual Results Summary from Waste Rock Management Plan
- 1.3.9 Water Licence Application, Appendix I: Mass Loading Model - Figures and Tables
- 1.3.10 Water Licence Application, Appendix J: Adaptive Management Plan
- 1.3.11 Water Licence Application, Appendix K: Preliminary Decommissioning and Reclamation Plan
- 1.3.12 Water Licence Application, Appendix L: Freshet Runoff Assessment
- 1.3.13 Water Licence Application, Appendix M: SRK 2009 Desktop Review, Effects of Water Extraction at Crystal Lake on Water Levels in the Keno City Community Well
- 1.3.14 Water Licence Application, Appendix N: Sludge Management Plan
- 1.3.15 Water Licence Application, Appendix O: YESAB 2009-0030 Decision Document - SEE EXHIBIT 9.2
- 1.4 Construction Site Plan, July 2009, 09.09.03
- 1.4.1 Construction Site Plan, Appendix A: Project Drawings
- 1.4.2 Construction Site Plan, Appendix B: Alexco List of Claims and Leases in Keno Hill Silver District
- 1.4.3 Construction Site Plan, Appendix C: Design Criteria
- 1.4.4 Construction Site Plan, Appendix D: Waste Management Plan
- 1.4.5 Construction Site Plan, Appendix E: Preliminary Decommissioning and Reclamation Plan
- 1.4.6 Construction Site Plan, Appendix F: Emergency Response Plan
- 1.4.7 Construction Site Plan, Appendix G: Heritage Resources Protection Plan
- 1.4.8 Construction Site Plan, Appendix H: Wildlife Protection Plan
- 1.4.9 Construction Site Plan, Appendix I: LQ0O240 Pre-Season Report Addendum (Phase I, Construction Site Plan)
- 1.4.10 Construction Site Plan, Appendix J: Technical Memo Regarding Temporary P-AML Waste Rock Storage Facility Geotechnical Stability
top
VOLUME IV
- 1.5 Applicant to YWB - Response to Review for Adequacy and Supplemental Information, Map before page 5, Table 7-2 before page 9, Map before page 15, 09.12.24
- 1.6 Closure Liability Cost Estimates for Alexco's Bellekeno Mine Project, 09.12.24
- 1.7 Quartz Mining Licence QML-0009, 09.12.24
- 1.8 Applicant to YWB - Response to Review for Adequacy and Supplemental Information, Map 1 after page 6, Map 2 after page 6, Site Plan Photo after page 36, Figure 5 after page 43,10.01.19
- 1.8.1 Response, Attachment A: Minnow Letter
- 1.8.2 Response, Attachment B: Test Results
- 1.8.3 Response, Attachment C: EBA, Dry-stacked Tailings Facility Preliminary Engineering Design and Management Plan
- 1.8.3.1 Dry-stacked Tailings Facility Plan: Figures (Cover page, Figure 9 & 10), Figure 1, Figure 2, Figure 3, Figure 4, Figure 5, Figure 6, Figure 7, Figure 8, Figure 11, Figure 12
- 1.8.3.2 Dry-stacked Tailings Facility Plan, Appendix A: Testhole Logs
- 1.8.3.3 Dry-stacked Tailings Facility Plan, Appendix B: Test Results
- 1.8.3.4 Dry-stacked Tailings Facility Plan, Appendix C: Slope Stability Plots - Fully Frozen Case
- 1.8.3.5 Dry-stacked Tailings Facility Plan, Appendix D: Slope Stability Plots - 1.2 metre Thawed Case
- 1.8.3.6 Dry-stacked Tailings Facility Plan, Appendix E: Slope Stability Plots - Fully Thawed Case
- 1.8.3.7 Dry-stacked Tailings Facility Plan, Appendix F: EBA's General Terms and Conditions
- 1.8.4 Response, Attachment D: Bellekeno 325 Adit Water Quality Results
- 1.8.5 Response, Attachment E: Excerpt from 1996 UKHM Site Characterization Report
- 1.8.6 Response, Attachment F: Bellekeno Mine Waste Rock Disposal Area stamped drawings
- 1.8.7 Response, Attachment G: Gallkeno 900 Sulphate-Reducing Bioreactor Interim Report
- 1.9 Alexco to YWB: withdrawing request to construct a bridge over Lightning Creek, 10.03.26
- 1.10 Alexco to YWB: Supplemental Information in Response to YWB Letter dated March 9, 2010, Table 7-2 after page 5, Flowsheet after page 32, Table 4 after page 34, 10.03.26
- 1.11 Alexco to YWB - Response to Review for Adequacy and Supplemental Information - In Response to YWB letter dated April 21, 2010, 10.04.28
- 1.11.1 Response to Review for Adequacy and Supplemental Information, Attachment A: EBA Letter dated April 23, 2010
- 1.11.2 Response to Review for Adequacy and Supplemental Information, Attachment B: Raw Hydrology Data, KV-7, KV9, KV-41
- 1.11.3 Response to Review for Adequacy and Supplemental Information, Attachment C: Excerpt from SRK report "2007/08 Geochemical Studies, Keno Hill Silver District, YT"
- 1.11.4 Response to Review for Adequacy and Supplemental Information, Attachment D: Minnow Letter Re: Clarification of Intended Minnow Reports
- 1.12 Alexco to YWB - Supplemental Information, 2010 Bellekeno Groundwater Program, 10.05.14
- 1.13 Additional Information, 10.05.26
- 1.14 Additional Information, 10.06.07
top
3. PUBLIC NOTICES
- 3.1 Advertisement, 10.05.05
4. CORRESPONDENCE
- 4.1 YWB to Applicant requesting further information/clarification, 09.12.10
- 4.2 YWB to Applicant requesting further information/clarification, 10.03.09
- 4.3 YWB to Applicant requesting further information/clarification, 10.04.21
- 4.4 YWB to Distribution List re: scheduling of public hearing, 10.05.04
- 4.5 YWB to Distribution List re: public hearing logistics, 10.06.09
top
5. INTERVENTIONS
- 5.1 Yvonne Bessette, 10.05.11
- 5.2 Robert Wagner, 10.05.25
- 5.3 Robert Wagner, 10.05.25
- 5.4 Yukon Conservation Society, 10.05.26
- 5.5 Yvonne Bessette, 10.05.26
- 5.6 Insa Schultenkotter, 10.06.03
- 5.7 Yukon Environment, 10.06.07
- 5.7.1 SLR Bellekeno Licence Review
- 5.7.1.1 Concentration Model Quarterly - ARSENIC
- 5.7.1.2 Concentration Model Quarterly - CADMIUM
- 5.7.1.3 Concentration Model Quarterly - COPPER
- 5.7.1.4 Concentration Model Quarterly - LEAD
- 5.7.1.5 Concentration Model Quarterly - NICKEL
- 5.7.1.6 Concentration Model Quarterly - SILVER
- 5.7.1.7 Concentration Model Quarterly - ZINC
- 5.7.2 Curriculum Vitae
- 5.8 Environment Canada, 10.06.07
- 5.8.1 McQuesten River Watershed/Mayo Lake Watershed
- 5.9 DFO, 10.06.07
- 5.10 James Milley, 10.06.07
- 5.11 Yvonne Bessette, 10.06.07
top
6. RESPONSES TO INTERVENTIONS
- 6.1 Response to Exhibit 5.4, 10.06.07
- 6.2 General Response to Interventions, 10.06.11
- 6.3 Response to Environment Canada Intervention, 10.06.11
- 6.4 Response to Yukon Government Intervention, 10.06.11
- 6.4.1 Attachment A - Mass Loading and Water Quality Assessment
- 6.4.2 Attachment B - Review of Predicted Water Quality
7. CURRENT/PREVIOUS WATER USE LICENCE(S)
- 7.1 QZ07-078 Water Use Licence - Alexco Resource Canada Corp., 10.06.04
- 7.1.1 QZ07-078 Reasons for Decision
- 7.2 QZ06-074 Water Use Licence with Amendments - Elsa Reclamation and Development Co. Ltd., 10.06.04
- 7.2.1 QZ06-074 Reasons for Decision with Amendments
8. LATE FILINGS
8.1 LATE FILINGS BY PARTIES
- 8.1.1 Letter from First Nation of Na-Cho Nyak Dun, 10.06.08
- 8.1.2 Letter from EMR regarding security, 10.06.11
- 8.1.3 Cirriculum Vitae, 10.06.11
- 8.1.4 Proposed Water Use Licence (revised), 10.06.14
- 8.1.5 2007 Tailings Monitoring Well Chemistry (Appendix D3), 10.06.14
- 8.1.6 Replacement Map, originally submitted in exhibit 1.8 as Map 1, Submitted as a Visual Aid, 10.06.14
- 8.1.7 Alexco Public Hearing PowerPoint Presentation, 10.06.14
8.2 LATE FILINGS REQUESTED BY BOARD
- 8.2.1 3D Model Images of Bellekeno Mine, 10.06.11
- 8.2.2 Bellekeno Mass Loading & Water Quality Model, 10.06.11 Copy Available Upon Request
- 8.2.3 Proposed (revised) Water Use Licence reflecting changes from version originally submitted, 10.06.15
- 8.2.4 Response to YWB Technical Advisor questions, June 15, 2010, 10.06.16
9. YESAA
- 9.1 Project Confirmation Form, 09.09.03
- 9.2 Decision Document, 09.09.03
10. DECISION
- 10.1 Water Use Licence
- 10.2 Reasons for Decision
11. Public Hearing Transcript
- 11.1 Index ~ Transcript